NEC4: Preparing a Design Build and Operate Contract
This document will provide guidance on the contract preparation for a Design, Build and Operate Contract (DBOC).
Chapter 2 Contract Data
- 2.1 Introduction
- 2.2 Contract Data checklist
- 2.3 Using Option Z: additional conditions of contract
Chapter 3 Scope
- 3.1 The status of the Scope
- 3.2 Drafting Scope
- 3.3 DBOC references to Scope
- 3.4 Client’s Scope
- 3.5 Scope provided by the Contractor for its design and plan
Chapter 4 Affected Property
- 4.1 The status of the Affected Property
- 4.2 Drafting the description of the Affected Property
- 4.3 DBOC references to the Affected Property
- 4.4 Affected Property
Chapter 5 Pricing document
- 5.1 Introduction
- 5.2 Price List
Chapter 6 Form of agreement
Appendix 1 Contract Data – Worked Example
Users should note that the NEC Forms of Contract are protected by copyright and may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without the prior permission of the copyright owner. However, Contract Data forms may be reproduced for the purpose of obtaining tenders, awarding and administering contracts.
Likewise, plagiarising any copyrighted document is illegal. For users seeking to prepare their own bespoke contracts based on the NEC Forms of Contract, please contact NEC at info@neccontract.com to discuss and obtain a copyright licence.
Paperbound
Product code: L48057-H
ISBN:
9780727762306
ePrint
Product code: L48057-P
ISBN:
9780727762863
eView
Product code: L48057-V
ISBN:
9780727762863