PSC chosen for Stonehenge bypass design

PSC chosen for Stonehenge bypass design


Highways England has appointed Aecom under an NEC3 Professional Services Contract (PSC) as technical partner for the £1.4 billion A303 Stonehenge bypass scheme. 

The eight-year consultancy contract, worth up to £50 million, is for preliminary design, planning and technical assurance of the detailed design and construction. Mouchel and Mace will work as supply chain partners to Aecom.

The existing 11km single carriageway section of the A303 between Amesbury and Berwick Down bisects the Stonehenge World Heritage site and passes within 100 m of the 5000-year-old monument. It is also a notorious traffic bottleneck.

The proposed option is to replace the single-carriageway with a new 11 km dual carriageway running further to the south and including a 3 km long tunnel. Construction is due to start in 3 years’ time
 
Recent Projects

Recent news

Avoiding Disputes with NEC4

Avoiding Disputes with NEC4

When used as designed, NEC Contracts are powerful tools for minimising disputes between project partners.

Read more
New NEC Training Advisory Panel established

New NEC Training Advisory Panel established

The Learning Solutions team at NEC has established a new NEC Training Advisory Panel, a strategic initiative designed to bring our customers even closer to the heart of our product development.

Read more
Constructing Conversations with Peter Higgins

Constructing Conversations with Peter Higgins

This month sees the start of an occasional series of informal interviews with NEC subject matter experts. The first is with Peter Higgins, Chair of the NEC4 Contract Board.

Read more
View all news