Upcoming NEC Training in Asia Pacific 2025

Upcoming NEC Training in Asia Pacific 2025

From introductory NEC training courses to fully accredited programmes, our training supports you at every stage of your NEC journey. Delivered by NEC experts with unrivalled knowledge of the NEC suite of contracts and their use across industry, our courses provide practical insights to enhance project delivery and drive innovation within your organisation. 

Earn the only NEC accreditation that ensures recognition on the official register of accredited professionals, reinforcing your credibility and professional expertise. Recognised worldwide, the NEC Accreditation Suite provides practitioners with advanced technical and practical skills to excel in NEC project leadership roles.

The virtual and blended training courses in Asia Pacific are delivered online in the location's time zone and is also suitable to those outside the region.

For full information and online bookings, click here. Please note, information was correct at the time of writing but may have changed subsequently.

NEC4 Training

Introduction to the NEC4 Engineering and Construction Contract (ECC)

A comprehensive overview of the NEC4 ECC, breaking down its key components for new users.

Date Delivery Format Location
30th September 2025 Virtual Training Australia

NEC4 ECC Project Manager Accreditation

This programme is designed to equip delegates with the skills necessary to be able to manage a project under an NEC4 Contract, with specific reference to role and importance of the Project Manager under the NEC4 ECC.

Date Delivery Format Location
1st September 2025 (Fully booked) Virtual Training Hong Kong
1st September 2025 Blended Training Singapore
6th September 2025 (Fully booked) Classroom Central (Hong Kong)
13th October 2025 Classroom Central (Hong Kong)
20th October 2025 Blended Training Singapore
10th November 2025 Classroom Kowloon (Hong Kong)
1st December 2025 Virtual Training Hong Kong
6th December 2025 Classroom Central (Hong Kong)

NEC4 Term Service Contract (TSC) Service Manager Accreditation

Running over four days and using a mix of learning material including case studies and scenario planning, this programme is designed to equip delegates with the skills necessary to be able to fulfil the role of a Service Manager in the NEC4 TSC.

Date Delivery Format Location
6th September 2025 Classroom Central (Hong Kong)
9th December 2025 Virtual Hong Kong

NEC4 Design Build and Operate Contract (DBOC) Service Manager Accreditation extension

Gain insight into how to use the DBOC, how to put it together, the contract strategy and how it is managed effectively. This course is designed for professionals who have completed either the NEC4 ECC Project Manager Accreditation or NEC4 TSC Service Manager Accreditation and wish to expand their expertise to include the DBOC.

 
Date Delivery Format Location
5th September 2025 Virtual Training Hong Kong

NEC3 to NEC4 ECC Project Manager Accreditation extension

One day of tutor-led training, which includes group working on case studies, to draw out the different processes in the NEC4 Engineering and Construction Contract (ECC) compared to the NEC3 ECC.

Date Delivery Format Location
8th September 2025 Virtual Training Hong Kong
3rd December 2025 Virtual Training Hong Kong
Recent Projects

Recent news

How NEC can provide a standard form for all PMBOK contract types

How NEC can provide a standard form for all PMBOK contract types

All PMBOK contract types can be effected using the main and secondary options of the NEC4.

Read more
NEC Publishes New Y Clauses to Support NEC4 Contracts in Singapore

NEC Publishes New Y Clauses to Support NEC4 Contracts in Singapore

NEC has released the latest set of secondary Option clauses developed specifically for use in Singapore, supporting the implementation of NEC4 Facilities Management Contract (FMC) in the region.

Read more
What NEC users need to know on England’s new Building Safety Act

What NEC users need to know on England’s new Building Safety Act

The Building Safety Act 2022 (BSA), the bulk of which came into force in England and Wales on the 28 April 2022 brought in several measures to make buildings safer for residents.

Read more
View all news