NEC TSC Hong Kong Edition
The NEC Term Service Contract (TSC) Hong Kong Edition has been drafted by NEC with the Hong Kong Development Bureau, based on the NEC4 TSC.
The NEC Term Service Contract (TSC) Hong Kong Edition has been drafted by NEC with the Hong Kong Development Bureau, based on the NEC4 TSC.